105 kW / 233 kWh Battery Storage CabinetCompact 400 V storage for distributed commercial sites.

An integrated LFP cabinet combining the battery string, 105 kW bidirectional PCS, BMS, EMS, liquid cooling and fire protection in one outdoor enclosure.

105 kW / 233 kWh Battery Storage Cabinet product configuration
Documented product configuration
105 kWRated AC output
233 kWhRated energy
2.22 hNominal duration
400 VAC interface

Application fit

Start with the operating duty.

This model is the compact starting point in the documented cabinet range. Its 832 V nominal LFP string feeds a 105 kW PCS and connects to a 400 V three-phase bus. It suits distributed sites that need a self-contained system without moving to a container platform.

Open the RFQ input checklist
01Peak shavingShift demand away from high-tariff periods and reduce peak demand exposure.
02Demand controlCoordinate dispatch against contracted capacity and measured site load.
03Dynamic capacitySupport sites where utility or transformer capacity constrains expansion.
04Backup reserveHold an agreed SOC reserve when the switching and critical-load boundary is defined.

Integrated architecture

Four layers form the starting platform.

The commercial scope still needs a project responsibility matrix covering every external interface.

01

Battery string

3.2 V / 280 Ah LFP cells arranged as 1P260S provide 233 kWh rated energy.

02

Power conversion

A 105 kW bidirectional PCS supports grid-connected and off-grid operating modes.

03

Control layer

BMS and EMS coordinate battery protection, operating strategy, alarms and communications.

04

Cabinet systems

Liquid cooling, IP54 enclosure, fire suppression and local auxiliary supply complete the platform.

Technical specifications

Documented configuration data.

Values are taken from the supplied manufacturer specification. Final purchase, installation and acceptance must use the approved project datasheet, drawings and test documents.

Engineering note: rated energy is not the same as guaranteed usable energy. Confirm SOC window, auxiliaries, ambient derating, ageing and operating reserve.
GroupParameterDocumented value
BatteryCell chemistry and formatLFP, 3.2 V / 280 Ah
BatteryRated energy233 kWh
BatteryNominal DC voltage832 V
BatteryDC voltage window650-949 V
BatteryString arrangement1P260S
PCSRated AC output105 kW
PCSMaximum AC output115.5 kW
PCSRated AC voltage400 V; 230/400 V off-grid
PCSMaximum output current167 A
PCSFrequency and power factor50/60 Hz; 0.99
PCSMaximum discharge efficiency98.5%
SystemCharge/discharge rate0.5C
SystemBase enclosure dimensions1000 x 1400 x 2415 mm
SystemInterface envelope1000 x 1470 x 2565 mm
SystemApproximate weight2.7 t
SystemCommunicationsCAN / RS485 / Ethernet
EnvironmentAltitudeUp to 3000 m; confirm derating for the project site
EnvironmentEnclosureIP54; C3 corrosion protection
EnvironmentOperating temperature-20 C to 55 C
EnvironmentRelative humidity0-95%, non-condensing
ThermalCoolingIntelligent liquid cooling
SafetyFire suppressionPerfluorohexanone system

Scope boundary

Separate product from project.

A comparable quotation makes included equipment and external responsibilities explicit.

Starting equipment scope

Documented platform

  • LFP battery string and high-voltage DC section
  • 105 kW bidirectional PCS
  • BMS and EMS control platform
  • Liquid-cooling equipment
  • Detection, suppression and emergency interfaces
  • Outdoor cabinet and internal auxiliary distribution

Project boundary

Confirm before quotation

  • Site transformer and upstream switchgear
  • Cable lengths, routes and terminations
  • Backup transfer device and protected-load schedule
  • Local grid code and protection settings
  • Civil foundation, lifting and service clearance
  • Certificates, FAT scope and commissioning responsibility

Buyer questions

Resolve these points before ordering.

Use the answers to narrow the design; use the final project documents to release the order.

Can this cabinet operate off-grid?

The PCS specification includes an off-grid AC mode, but a complete backup system still requires the protected-load schedule, transfer device, earthing method, restart logic and reserve SOC to be confirmed.

Is 233 kWh fully usable?

233 kWh is the rated battery energy. Usable project energy depends on the permitted SOC window, temperature, auxiliary consumption, ageing allowance and operating reserve.

Can the unit be installed outdoors?

The documented enclosure is IP54 with C3 corrosion protection. Ambient conditions, drainage, solar exposure, service access and coastal or desert distance requirements still need site review.

What information is needed for a quotation?

Provide the interval load profile, grid voltage, target operating mode, site country, ambient range, cable boundary, delivery access and required FAT or certification evidence.

Buyer engineering guides

Check the assumptions around this configuration.

Connect the product data to measured demand, electrical design, safety evidence and quotation scope.

Compare adjacent configurations

Continue the product review.

Compare power, duration, interface and project boundary before selecting a starting platform.

Product quick RFQ

Match this configuration to the real site.

Send the country, operating target and the first project requirements. The product title and source page are attached automatically.

Directly routed to the project review inboxNo public pricing or purchase commitmentDetailed electrical data can follow by email
[[PRODUCT_RFQ_FORM]]