ELECNO 19MWh Energy Storage Project

An operational ELECNO battery energy storage project with a recorded capacity of 19MWh, supported by original equipment documentation.

Battery module arrangement documented for the ELECNO 19MWh project
Original equipment-stage photograph; not a customer-site photograph.

Project at a glance

From the ELECNO project record.

This ELECNO project combines battery energy storage equipment with an energy management system. The project record identifies a 19MWh storage capacity, and ELECNO has confirmed that the project is in operation.

19 MWhRecorded storage capacity
In operationOperating status confirmed by ELECNO
Battery storage + EMSDisclosed system scope
Client identity, project location and commissioning dates remain confidential. This project profile does not publish customer operating data or financial results.

Original equipment record

Equipment documentation.

The retained equipment photograph shows the battery module arrangement and connections. It is used as an equipment-stage record for this project, not as a photograph of the customer’s operating site.

Product and engineering illustration

Storage equipment in context.

Buyer engineering takeaway

Use the project scale as a starting point, not a specification.

For a similar project, define the required AC or DC interface, charge and discharge power, usable energy window, control responsibilities and site constraints before selecting equipment.

Battery capacity alone does not establish output power, backup duration, grid-code compliance or financial performance. Those requirements belong in the project datasheet and supply scope.

Bring these inputs to the review.

  • Application, target power, energy and operating window.
  • Load profile, site voltage and point of connection.
  • Battery, conversion, EMS and external equipment boundaries.
  • Required documents, acceptance criteria and service responsibilities.

Related products support new-project selection; they are not a bill of materials for this installation.

Project questions

About this anonymous project profile.

Is this project in operation?

ELECNO has confirmed that this 19 MWh project is in operation.

Why are customer and site details not shown?

Client names, project locations and commissioning dates are withheld to protect customer confidentiality.

Does this case identify the exact equipment for a new order?

No. Use this case as a project reference. A new order needs its own confirmed power and energy requirements, electrical interfaces, equipment scope and acceptance criteria.

Are the photographs from the operating customer site?

No. The retained original photographs show equipment-stage documentation. They are not labelled as customer-site or commissioning photographs.

Discuss a similar project

Start with the application and site requirements.

Share the target power and energy, operating objective, site voltage and integration scope. Detailed load data and drawings can follow by email.