ELECNO · Operational project

ELECNO 2MWh Energy Storage Project

An operational ELECNO battery energy storage project with a recorded capacity of 2MWh and energy management system integration.

2 MWhBattery storage + EMSOperational project · Client details confidential

Project at a glance

From the ELECNO project record.

The project record describes a 2MWh battery energy storage system with an energy management system. ELECNO has confirmed that the project is in operation. This anonymized profile presents the disclosed system scope without identifying the customer or site.

2 MWhRecorded storage capacity
In operationOperating status confirmed by ELECNO
Battery storage + EMSDisclosed system scope
Client identity, project location and commissioning dates remain confidential. This project profile does not publish customer operating data or financial results.

Published project scope

A concise, privacy-preserving project profile.

The public profile focuses on the confirmed capacity, system scope and operating status. Equipment selection, power rating and a bill of materials for a new project should be agreed separately rather than inferred from this case.

Product and engineering illustration

Cabinet architecture, illustrated.

Buyer engineering takeaway

Use the project scale as a starting point, not a specification.

For a similar project, define the required AC or DC interface, charge and discharge power, usable energy window, control responsibilities and site constraints before selecting equipment.

Battery capacity alone does not establish output power, backup duration, grid-code compliance or financial performance. Those requirements belong in the project datasheet and supply scope.

Bring these inputs to the review.

  • Application, target power, energy and operating window.
  • Load profile, site voltage and point of connection.
  • Battery, conversion, EMS and external equipment boundaries.
  • Required documents, acceptance criteria and service responsibilities.

Related products support new-project selection; they are not a bill of materials for this installation.

Buyer checklist

What to verify before accepting a 2 MWh BESS quotation

This operating project documents 2 MWh of storage and energy management system (EMS) integration. It does not establish the power rating, usable energy, equipment models or delivery scope for a new purchase. Ask each supplier to quote against the same requirements and identify any exclusions.

1. Application and operating duty

Share the load profile, duty schedule, target charge and discharge power, usable energy and required operating duration. Specify the primary application and dispatch objective, such as peak shaving or backup, so suppliers size for the same duty.

2. AC/DC interface and power boundary

Request a single-line diagram and an equipment scope matrix. Confirm the point of connection and who supplies the battery, power conversion system (PCS), transformer and switchgear. Do not infer power or duration from the 2 MWh figure alone.

3. Battery and battery management system

Request the offered battery and BMS datasheets. Compare chemistry, nominal and usable energy, voltage range, state-of-charge limits, temperature limits, and who handles replacement. Match the documents to the quoted models and revisions.

4. EMS, metering and controls

Ask for a control narrative, meter locations, an EMS point list, communication protocols and the behavior on loss of signal. Use the EMS commissioning checklist to define the control and alarm tests.

5. Site interface and safety

Provide site voltage, ambient conditions and layout constraints. Confirm responsibility for protection coordination, thermal and fire protection, foundations, cable routes and permits. Use the quality and compliance checklist to identify the documents required for the installation destination and offered configuration.

6. Delivery and acceptance

Request a responsibility matrix that covers packing, transport, unloading, installation, commissioning, training, spares and warranty support. Agree on factory and site acceptance criteria, who signs off and which records are handed over. Use the factory acceptance test checklist to agree on what must be demonstrated before shipment.

Before comparing prices: ask for the same set of documents from each bidder: the project datasheet, single-line diagram, equipment scope matrix, acceptance test plan and written delivery and warranty terms. These are documents for a new order, not published records from this case.

Project questions

About this anonymous project profile.

Is this project in operation?

ELECNO has confirmed that this 2 MWh project is in operation.

Why are customer and site details not shown?

Client names, project locations and commissioning dates are withheld to protect customer confidentiality.

Does this case identify the exact equipment for a new order?

No. Use this case as a project reference. A new order needs its own confirmed power and energy requirements, electrical interfaces, equipment scope and acceptance criteria.

Discuss a similar project

Start with the application and site requirements.

Share the target power and energy, operating objective, site voltage and integration scope. Detailed load data and drawings can follow by email.