
Energy storage cabinet manufacturer
Energy Storage Cabinet Manufacturer: verify the source and scope.
StorageCabinetPro helps EPCs and industrial buyers review cabinet and container BESS configurations. ELECNO coordinates project requirements; manufacturer facts below are limited to supplied Wanyang Power and Jiyuan Wanyang Group materials and must be confirmed for the ordered model.
Manufacturer responsibility
What buyers should expect from an energy storage cabinet manufacturer.
A credible supplier identifies the project contact, manufacturing source, exact product scope and legal responsibility before production.
ELECNO project team
Coordinates international inquiries, application review, initial product matching, quotation inputs and commercial communication through StorageCabinetPro.
Wanyang Power portfolio
The supplied C&I product materials identify Wanyang Power within Jiyuan Wanyang Group as the manufacturing source for the documented battery and energy-storage range.
Exact legal and technical scope
The quotation and contract must name the legal seller and manufacturer, model, configuration, certificate set, warranty provider, delivery term and service responsibility.
Supply scope
Start with a documented cabinet or container platform.
The current product materials cover C&I energy storage cabinets, containerized BESS and project-configured electrical interfaces. Final availability and component scope must be confirmed in the quotation.
105–250 kW C&I cabinet platforms
Documented starting configurations include 105 kW / 233 kWh, 125 kW / 261.2 kWh and 250 kW / 522.5 kWh liquid-cooled LFP systems.
Open page1.25–2.5 MW container platforms
Documented starting configurations include 1.25 MW / 3.354 MWh, 1.725 MW / 5.016 MWh and 2.5 MW / 5.016 MWh systems.
Open pageFreeze every included interface
Battery, PCS, EMS, cooling, fire protection, transformer, switchgear, communications and field services must be marked as included, optional or site scope.
Open pageDocumented company profile
What the supplied manufacturing profile states.
These figures describe Jiyuan Wanyang Group in the supplied C&I brochure. They are not presented as ELECNO company figures.
| Profile item | Documented statement | Buyer verification |
|---|---|---|
| Operating history | Established in 1995 in Henan, China. | Confirm the current legal manufacturer named in the quotation. |
| Group scale | Registered capital of RMB 280 million, total assets of RMB 15 billion and a 1.31 million m² footprint are stated in the brochure. | Treat group-level figures separately from the contracting entity. |
| Workforce and structure | More than 6,000 employees, two business divisions, 20 wholly owned subsidiaries and six joint ventures are stated. | Request the responsible factory and engineering contact for the ordered model. |
| Management systems | ISO 9001, ISO 14001 and ISO 45001 management-system certifications are referenced. | Request current certificates showing holder, scope, site and validity. |
| Business coverage | The profile describes lead-acid, lithium-battery and new-energy product R&D, manufacturing and sales, with overseas operating presence. | Confirm whether the requested model and destination market are within current supply scope. |
Documented references
Project examples shown in the supplied portfolio.
References demonstrate portfolio experience, but they do not replace model-specific drawings, FAT records or a contract responsibility matrix.
| Reference | Location / owner shown | Portfolio note |
|---|---|---|
| 30 MWh energy storage project | Jiyuan, Henan / Lianchuang Chemical | Industrial storage reference using a liquid-cooling solution. |
| 19 MWh energy storage project | Gongyi, Henan / Foshan Aluminum | Industrial energy-storage project reference. |
| 6.7 MWh energy storage project | Jiyuan, Henan / Jinkangda Industrial | Industrial energy-storage project reference. |
| 2 MWh energy storage project | Jiyuan, Henan / Cathay Pacific Platinum | Industrial energy-storage project reference. |
| 6.4 MWh energy storage project | Chad, Africa | Overseas project reference shown in the brochure. |
Evidence before deposit
Turn manufacturer claims into purchase evidence.
A credible project file connects the named parties, exact equipment and acceptance records.
Identify the parties
Record the seller, manufacturer, warranty provider, payment beneficiary and project contacts.
Identify the equipment
Freeze model codes, quantities, battery and PCS scope, drawings, options and exclusions.
Identify the evidence
List certificates, test reports, FAT records, shipment documents and commissioning deliverables.
Manufacturer questions
Questions buyers ask before supplier approval.
Use these answers to structure due diligence; the final evidence must match the ordered model, production site and destination market.
What should buyers verify when selecting an energy storage cabinet manufacturer?
Verify the legal manufacturer and factory, supported cabinet or container models, exact component scope, current model-specific certificates, engineering drawings, FAT plan, delivery boundary and warranty provider.
Which documents should a BESS supplier provide before production?
Approve the project datasheet, single-line diagram, general arrangement, equipment and responsibility matrix, protocol map, certificate register, document schedule and FAT plan before production begins.
Does StorageCabinetPro manufacture energy storage cabinets directly?
StorageCabinetPro is ELECNO’s project inquiry and engineering-coordination channel. Manufacturing evidence on this page comes from supplied Wanyang Power and Jiyuan Wanyang Group materials; the final quotation and contract must name the legal seller, manufacturer and warranty provider.
Can one supplier provide both energy storage cabinets and container BESS?
The documented portfolio includes both C&I cabinet and containerized BESS starting platforms. The available model, PCS and battery architecture, transformer interface, certification set and delivery scope still require project-specific confirmation.
How should manufacturer project references be checked?
Ask which model, production site, control architecture and delivery team were used, whether the reference may be contacted, and which records are available. A portfolio example does not replace current drawings, certificates or FAT evidence.
Project inquiry
Request the evidence for your exact configuration.
Send the target model, project country, application, voltage, power and energy requirement. The reply should identify what is standard, optional and still subject to engineering confirmation.
